Contact Us

TEL: +86-532-87237920
Fax: +86-532-87237920
E-mail: info@blowingplastics.com
Address: Site is located in the west of Taidong road and north of Xinjiang in Qingdao

2000L Six Layers Water Storage Tank Making Machine

2000L Six Layers Water Storage Tank Making Machine

Suntop 10000L six layers water storage tank making machine production safety procedures To prepare well before starting up is the primary problem of blow molding machine production. It is the basic premise for subsequent production operation. It mainly includes the following steps. 1) Heating and holding time is enough to meet the temperature requirement of production. 2) When producing blow molding products, the air compressor should be opened 30 minutes in advance to meet the required air pressure condition.

2000L six layers water storage tank making machine



Suntop 2000L six layers water storage tank making machine production safety procedures

To prepare well before starting up is the primary problem of blow molding machine production. It is the basic premise for subsequent production operation. It mainly includes the following steps.

1) Heating and holding time is enough to meet the temperature requirement of production.

2) When producing blow molding products, the air compressor should be opened 30 minutes in advance to meet the required air pressure condition.

3) During the heating process of the equipment, the cooling water pump should be opened in time, and the upper part of the upper part of the servo cylinder connects the cooling water.

4) The production of raw materials prepared in advance, including high density polyethylene, color masterbatch, and mixed with a good material for production purposes.

5) Before making the production, we should do well in cleaning and cleaning of the blow molding machine body and production environment, preparation of production debugging tools, magnetic rack inspection and cleaning.

6) Lubrication point blow molding machine head, frame, cylinder and other parts of the spray lubrication required everywhere, avoid machine wear.

7) Open the main oil pump and enter the manual page. According to the operation rules, we should debug and execute the following actions in turn.

Open mode in place

Blow the needle up and down

Expanding and closing in place

Mechanic hand in place

Clamping device opening and closing

Lower seal opening and closing

Top rod and retreat

配图.png


Hot Tags: 2000l six layers water storage tank making machine, manufacturer, supplier, price, for sale
Inquiry